Client cases

204kWh – Bosma & Bronkhorst (off-grid)

Energy storage at Bosma & Bronkhorst for Peakshaving, self-consumption and off-grid use.
Energy storage Rugby Club Haarlem

314kWh – Rugby Club Haarlem

Energy storage system from Cellpower at Rugby Club Haarlem for peakshaving and self-consumption purposes
Energie-Versorgung Niederösterreich (EVN)

1.4 MWh – Energy Supply Lower Austria (EVN)

1.4 MWh Cellpower energy storage for energy trading at Energie-Versorgung Niederösterreich (EVN)
Cell Power

1.9 MWh – Albert Heijn

Application Peak shaving EMS Univers Installer Equans End customer Albert Heijn Location Zaandam, The Netherlands Net Energy 1.9 MWh Systems 8 x CESS 233-100 Albert Heijn’s distribution centre in Zaandam is taking an important step towards making its logistics more sustainable. The replacement of fossil fuel-powered lorries with 70 electric vehicles led to a sharp … Continued

942 kWh – Gamma & Plaza Padel

Application Peak shaving EMS Withthegrid Wholesaler Technische Unie Installation partner v.d. Vleuten Elektrotechniek & Beveiliging End customer Gamma & Plaza Padel Location Beuningen, The Netherlands Net Energy 942 kWh Systems 3 x CESS 314-125
Cell Power

102 kWh – Fa. Dekker en Zn.

Application Energy trading EMS Envitron Installer Energie Intern End customer Fa. Dekker en Zn. Location Heerhugowaard, The Netherlands Net Energy 102 kWh Systems CESS 102-50

280 kWh – Avia Marees

Application Peak shaving EMS Embion Installer Van der Laan End customer Avia Marees Location Schagerbrug, The Netherlands Net Energy 280 kWh Systems CESS 280-125

522 kWh – Van Haandel Metaal

Van Haandel Metaal is investing in a Dutch battery solution to continue meeting the company’s energy needs. Due to rapid growth and the electrification of production, the family business reached the limits of its contracted capacity at the beginning of 2025.
Cell Power

204 kWh – Poultry farm Torsius

Application Energy Trading EMS Envitron Installer Energy Shift End customer Poultry farm Torsius Location Putten, The Netherlands Net Energy 204 kWh Systems 2 x CESS 102-50
Cell Power

460 kWh – KdK Conferentiehotel

Application Peak shaving EMS Envitron Installer Energie + Dak End customer Nieuwe Stroom – KdK Conferentiehotel Location Soesterberg, The Netherlands Net Energy 460 kWh Systems 2 x CESS 280-125
Cell Power

233 kWh – Goat farm Tricht

Application Energy Trading EMS Embion Installer E2 Energie End customer Goat farm Tricht Location Tricht, The Netherlands Net Energy 233 kWh Systems CESS 233-116
Cell Power

102 kWh – Den Doorn

Application Self consumption & Peak shaving EMS Integrated Wholesaler Technische Unie Installer Den Doorn End customer Den Doorn Location Giessen, The Netherlands Net Energy 102 kWh Systems CESS 102-50
Cell Power

2.5 MWh – Hegron Cosmetics

Application Self consumption & Peak shaving EMS Withthegrid Installer Van der Laan End customer Hegron Cosmetics Location Purmerend, The Netherlands Net Energy 2.5 MWh Systems 8 x CESS 314-125
Cell Power

840 kWh – GUMAG Vastgoed

Application Energy trading EMS Covolt End customer GUMAG Vastgoed Location Chaam, The Netherlands Net Energy 840 kWh Systems 3 x CESS 280-125

314 kWh – MTS Grootheest

Application Peak shaving & Self consumption EMS Embion Wholesaler Technische Unie Installation partner Elektro Technisch Buro Van de Beek End customer Maatschap Grootheest Location Bennekom, The Netherlands Net Energy 314 kWh Systems CESS 314-125

280 kWh – Poultry farm MTS Geling

Application Peak shaving & Self consumption EMS Embion Wholesaler Technische Unie Installation partner Elektro Technisch Buro Van de Beek End customer Maatschap Geling Location Dronten, The Netherlands Net Energy 280 kWh Systems CESS 280-125
Cell Power

466 kWh – Goatfarm Cor Deenen

Application Peak shaving & Self consumption EMS Covolt Wholesaler Alius Installation partner Connectro End customer Cor Deenen Location West- en Middelbeers, The Netherlands Net Energy 466 kWh Systems 2 x CESS 233-116
Cell Power

280 kWh – Pig farm Heijkant

Application Peak shaving EMS Schneider Electric Wholesaler Alius Installation partner Connectro End customer Heijkant Werfkampen Location Raamsdonksveer, The Netherlands Net Energy 280 kWh Systems CESS 280-125
Cell Power

560 kWh – Garden Center Coppelmans

Application Peak shaving EMS Covolt Wholesaler Alius Installation partner DES Energy Solutions End customer Garden Center Coppelmans Location Veldhoven, The Netherlands Net Energy 560 kWh Systems 2 x CESS 280-125
Cell Power

233 kWh – Grand Hotel Maastricht

Application Peak shaving EMS Embion Wholesaler Alius Installation partner DES Energy Solutions End customer Grand Hotel Maastricht Location Maastricht, The Netherlands Net Energy 233 kWh Systems CESS 233-116
Cell Power

233 kWh – A.C. Den Hartog en Zn

Application Peak shaving EMS Embion Wholesaler Alius Installation partner Strago Electro End customer A.C. Den Hartog en Zn Location Everdingen, The Netherlands Net Energy 233 kWh Systems CESS 233-116
Cell Power

233 kWh – Soltecs

Application Self consumption & Peak shaving EMS Embion Wholesaler Alius Installation partner Soltecs End customer Soltecs Location Oeffelt, The Netherlands Net Energy 233 kWh Systems CESS 233-116

6,9 MWh – COA-asielopvang Zaandam

the reception center of the Central Agency for the Reception of Asylum Seekers (COA) in Zaandam, a battery storage system ensures a reliable energy supply for the site, minimizing the use of diesel generators running on ecological diesel. Together with Electroproject and EQUANS, we have implemented an integrated energy solution that supplements the limited grid … Continued

6,9 MWh – Hoppenbrouwers

Too much power, not enough grid space As a leading System Integrator, Hoppenbrouwers sees daily the impact of grid congestion on its end customers. Jop van Hasselt (project leader) explains: “We see it with almost all of our clients: expansion plans are stalled due to a shortage of grid capacity. In some cases, projects are … Continued

TommyTomato

TommyTomato prevents peak load with Cellpower energy storage system At TommyTomato’s new production site in Utrecht, an energy storage system from Intercel allows the company to run without restrictions. TommyTomato delivers healthy vegetable lunches to elementary school and prepares these meals fresh daily on site. During the morning hours, the ovens run at full power, … Continued

233 kWh – Herko Vastgoed

Smart energy storage at Herko Vastgoed: How Intercel helps with grid congestion and peak consumption As a business owner with a growing energy demand, you may be wondering: does an energy storage system really work? How does the installation work? And does it actually deliver the benefits that are promised? Mike den Hertog, director of … Continued

233 kWh – Select Windows B.V.

Select Windows B.V. finds solution for network expansion waiting time Select Windows is known for its high-quality plastic window frames, windows, doors and sliding doors that are produced entirely to size in GevelNed’s factory. Theo van Gorkom, owner of Select Windows: “We are growing as an organization and wanted to expand our production facilities with … Continued

99 kWh – BGO Expat Housing

Cellpower offers BGO the solution for grid congestion When BGO decided to build an Expat Hotel for workers in the Waalwijk area, everything seemed to be going according to plan. They found a suitable location and had the investors to make their sustainable vision a reality. But then came the reality of the energy market: … Continued

High quality and do what you promise

100% confidence

An interview with Cornel Buholzer, Managing Director of Buholzer Batterien Switzerland and distributor of Intercel. Can you tell us more about yourself and your company? After studying engineering at the University of Technology, I immediately joined our family business. From the first day I enjoyed it, it is interesting work that changes every day due … Continued

Plug and play mobile power supply

Off-grid building and working How did the collaboration with Intercel go? “It started with our idea to develop a new hybrid and mobile genset especially suitable for the construction and residential market. Particularly high energy density, operational reliability and ease of use were prerequisites for this. Because of our experience with engines, this part of … Continued

ABG Solar

Reliable energy storage for solar panels What do you do when you want to get more power from the grid than is allowed? Then you contact ABG Solar for solar panels – AND energy storage! The Dutch company has been a leading player in the field of solar panels in the agricultural sector for ten … Continued

600 kWh – Joulz

Collaborating on innovative solutions In the increasingly complex world of energy management, Joulz and Intercel have collaborated on an innovative solution to grid congestion. This article explains how Joulz, in collaboration with Intercel, is deploying a Virtual Power Grid (VPG) to reduce grid congestion and promote energy transition. Grid congestion at KAN Logistics Park Early … Continued

The ESaver: from residential neighborhood to construction site, from event to home

An interview with Franz Hullegie (Innovation Manager Bredenoord) and Robin Been (Key Account Manager) at Intercel. A new and unique product, the ESaver. How did it come about? Franz: “Until recently, we developed all the products entirely in-house, but we regularly ran out of time to further electrify our rental products. We got into conversation … Continued

Marker Wadden

Marker Wadden completely independent of the grid The artificial island Marker Wadden in the Markermeer has been constructed for nature conservation and restoration. By constructing the nature island with sand, clay and silt from the Markermeer, new nature will develop. Both under and above water. The island is completely self-sufficient and independent of what happens … Continued

Joint development Bredenoord Battery Box 30

Sustainable Off-grid power Intercel and Bredenoord have partnered in the development of Bredenoord’s Battery Box 30. The Battery Box 30 has been developed to meet the increasing demand for reliable and sustainable energy storage solutions, especially in remote areas or locations where access to the grid is limited. Built with a vibration-proof customized lithium Iron … Continued

The Green Aggregate

Playing a prominent role together in the necessary energy transition A rapid energy transition from diesel to electric is taking place at construction sites, infra and festivals. Generators play an important role at these locations to provide easy and efficient access to power. The former diesel generators had major disadvantages; high diesel consumption with all … Continued