836 kWh – Postillion Hotels

Three hotels off gas, without a heavier grid connection, How do you fully electrify three busy hotels within one year, keep them open the whole time and stay within the grid capacity you already have?

Challenge: Going all-electric meant using more power than the grid connection allowed


Postillion Hotels wanted to make its locations in Bunnik, Amersfoort and Deventer more sustainable. Moving heating and hot water from gas to electricity was central to that plan. But going all-electric means using a lot more electricity, and adding more contracted grid capacity was not an option. On top of that, all the work had to be finished within one year, with the hotels open to guests throughout.

ApplicationPeak shaving,self-consumption, staying within grid capacity
EMSEmbion
InstallerDES
End customerPostillion Hotels
Location(s)Bunnik, Amersfoort & Deventer, The Netherlands
Net Energy836 kWh
Systems1 x Cess 314-125, 2 x Cess 261-125

Solution: Three Cellpower systems keep demand within the existing connection

Each hotel now has a Cellpower battery storage system supplied by Intercel:

  • Bunnik: 314 kWh
  • Amersfoort: 261 kWh
  • Deventer: 261 kWh

That adds up to 836 kWh of storage capacity. The batteries store surplus solar power for use later in the day and absorb peaks in electricity demand. Solar panels, batteries and an energy management system work together so that each hotel’s consumption stays within its existing contracted capacity.

Cellpower was chosen for three reasons: the right capacity for each site, suitability for outdoor installation, and remote monitoring.

Result: All three hotels are now gas-free, with no grid upgrade needed

Gas-free hotels: heating and hot water now run fully on electricity.

No grid upgrade needed: the hotels electrified without a heavier connection and its extra fixed costs.

More of their own solar power used: surplus solar energy is stored instead of sent back to the grid.

Business as usual: about twenty sustainability measures per hotel, all carried out while the hotels stayed open

“The challenge was to make the hotels sustainable within a year.”

Jarno Thijs,
Thijs Engineering & Consultancy

Facing grid congestion while electrifying your building?

Contact Intercel to find out what battery storage can do for your site.

We’re happy to help

More stories

  • 836 kWh – Postillion Hotels

    Postillion Hotels went gas-free at three locations with 836 kWh of Cellpower storage, all within their existing grid connections.

  • City-Pomp E – Machined4You

    Machined4You’s City-Pomp E is an electric construction pump that uses an Intercel battery pack to absorb peak loads. This lets the pump run on a standard 230V…

  • 783 kWh – SPIE Breda

    SPIE uses a 783 kWh Intercel energy storage system at its Breda headquarters for peak shaving. Controlled by Phoenix Contact’s MINT EMS, the battery makes extra power…