783 kWh – SPIE Breda

What does a company that helps others with grid congestion do when its own headquarters runs into the limits of its grid connection? SPIE, a European leader in multi-technical services, chose the same approach it offers its clients: battery storage from Intercel.

The challenge: Continued electrification, limited grid capacity

Like many companies, SPIE is electrifying more and more of its operations. At the same time, the capacity of its grid connection is limited, and getting a heavier connection is often not possible in the short term. This is a challenge SPIE knows well from its clients. As a multi-technical service provider, SPIE designs and installs energy storage solutions for companies facing grid congestion. At its headquarters in Breda, it faced the same question: how do you make room for more electricity demand without going over the limits of your existing grid connection?

ApplicationPeak shaving
EMSMINT – Phoenix contact
InstallerSPIE
End customerSPIE
LocationBreda, The Netherlands
Net Energy783 kWh
Systems3 x CESS 261-125

The solution: 783 kWh of battery storage with smart control

SPIE chose an Intercel energy storage system made up of three Cellpower CESS 261-125 units, with 783 kWh of storage capacity and 375 kW of power in total.

The system uses peak shaving. The battery charges when demand is low and delivers extra power at peak moments, so the load on the grid connection stays within its limits.

The MINT Energy Management System (EMS) from Phoenix Contact controls the battery. MINT connects energy generation, storage and consumption within the building and makes sure the battery is used at the right moments.

SPIE handled the installation itself. This is not the first time SPIE has chosen Intercel for its own locations: at its Experience Center in Hoogezand, an Intercel battery system lets a charging plaza run within the existing grid connection.




“Many companies have a limited grid connection while electrification continues. With energy storage and smart control, you can still make extra power available within that existing connection.”

Home

Rogier Paanakker,
Business Unit Manager at SPIE


The result: Room for electrification within the existing connection

With the energy storage system in Breda, SPIE can make extra power available at its headquarters without a heavier grid connection. Peak loads are absorbed by the battery, which gives SPIE room to keep electrifying. At the same time, SPIE now applies the solution it recommends to its clients at its own headquarters. The project shows how battery storage and smart energy management help companies get more out of their existing grid connection.

Facing limited grid capacity?

Find out how Intercel’s energy storage systems help you get more out of your existing grid connection.

We’re happy to help

More stories

  • City-Pomp E – Machined4You

    Machined4You’s City-Pomp E is an electric construction pump that uses an Intercel battery pack to absorb peak loads. This lets the pump run on a standard 230V…

  • 783 kWh – SPIE Breda

    SPIE uses a 783 kWh Intercel energy storage system at its Breda headquarters for peak shaving. Controlled by Phoenix Contact’s MINT EMS, the battery makes extra power…