628 kWh – AVIA Volt Zwaag

Electric drivers expect to charge fast. But what if the grid connection can’t deliver the power that fast charging needs? At its charging location in Zwaag, AVIA Volt solved this with battery storage from Intercel.

AVIA VOLT develops charging solutions for electric vehicles, ranging from standard charging points to fast-charging infrastructure. At these locations, limited grid capacity can present a challenge, particularly when several vehicles charge simultaneously. By combining battery storage with smart energy management, peak demand can be managed more effectively, allowing better use of the existing grid connection.

ApplicationPeak shaving
EMSEmmett Green
InstallerVan der Laan
End customerAVIA Volt
LocationZwaag, The Netherlands
Net Energy628 kWh
Systems2 x CESS 314-125

The challenge: Fast charging on a limited grid connection

AVIA Volt is the EV charging brand of AVIA, the fuel station network that is building charging infrastructure across the Netherlands. As more drivers switch to electric, demand for fast charging keeps growing.

Fast chargers need a lot of power at the moments when several cars charge at once. Those peaks can quickly go over the capacity of a site’s grid connection. A heavier connection is often not available, or only after a long wait. AVIA Volt needed a way to offer reliable fast charging in Zwaag within the limits of the existing grid connection.

The solution: 628 kWh of battery storage with smart control

Together with technical installer Van der Laan, AVIA Volt chose an Intercel energy storage system made up of two Cellpower CESS 314-125 units, with 628 kWh of storage capacity in total. The system uses peak shaving. The battery charges when demand is low and delivers extra power when several vehicles are charging at once. The grid connection therefore doesn’t have to supply the full charging demand at peak moments. The Emmett Green Energy Management System (EMS) controls the battery. It decides when to charge and discharge, so that the battery is ready when demand rises and the site stays within its grid capacity.

The result: More charging power within the existing connection

With the energy storage system, AVIA Volt can offer more charging power in Zwaag than its grid connection alone would allow. The battery absorbs the peaks, so drivers can charge reliably, even at busy moments, without the site needing a heavier grid connection right away. The project shows how battery storage helps charging operators expand their infrastructure, even where grid capacity is limited.

“The AVIA VOLT charging plaza at MTP Zevenhuizen has been renovated and expanded to no fewer than eight fast charging points. This prepares the location for the growing demand for fast and reliable charging.

In addition, two battery systems for energy storage have been installed. This allows locally generated solar energy to be used more efficiently, relieves the electricity grid and allows us to use energy even smarter.”

AVIA VOLT

Facing limited grid capacity at your charging location?

Find out how Intercel’s energy storage systems help you get more out of your existing grid connection.

We’re happy to help

More stories

  • City-Pomp E – Machined4You

    Machined4You’s City-Pomp E is an electric construction pump that uses an Intercel battery pack to absorb peak loads. This lets the pump run on a standard 230V…

  • 783 kWh – SPIE Breda

    SPIE uses a 783 kWh Intercel energy storage system at its Breda headquarters for peak shaving. Controlled by Phoenix Contact’s MINT EMS, the battery makes extra power…

  • Q8 – Benelux

    Q8 Electric combines Cellpower battery storage from Intercel with Flexecharge’s EMS to expand its fast-charging network across the Benelux. The batteries absorb charging peaks, so new locations…