Q8 – Benelux

Demand for EV charging is growing fast. But what if you want to build new fast-charging stations at sites where the grid doesn’t have enough capacity? For Q8 Electric, this is a key challenge in expanding its charging network across the Benelux. By combining Intercel battery storage with smart energy management, Q8 Electric can keep growing without relying fully on extra grid capacity.

The challenge: Growing charging demand, limited grid capacity

As a Charge Point Operator (CPO), Q8 Electric develops and operates fast-charging locations across the Benelux. With electric mobility growing quickly, demand for fast charging keeps rising, while grid capacity at many sites is limited. Fast chargers need high power, especially when several vehicles charge at the same time. This creates peak loads that can go over the capacity of the grid connection. For Q8 Electric, the challenge is therefore not only to open new charging locations, but also to make the best possible use of the energy available. At the same time, the charging experience has to stay reliable and predictable for drivers.

ApplicationPeak shaving, energy management & energy storage
EMSFlexecharge
End customerQ8 Electric
LocationBenelux
SolutionCellpower BESS
Battery supplierIntercel Group
SectorFast-charging infrastructure

The solution: Battery storage and smart energy management

To meet this challenge, Q8 Electric works with Intercel and Flexecharge. Cellpower Battery Energy Storage Systems (BESS) from Intercel are combined with Flexecharge’s Energy Management System (EMS).

The EMS distributes the available energy across the chargers and the battery in real time. When several vehicles charge at once and demand rises, the battery delivers extra power. This absorbs peak loads on site and makes better use of the contracted grid capacity.

Battery storage also makes it possible to store electricity when it is cheap or widely available, and then use it at peak moments.

“By combining battery storage with smart control through energy management systems, we can expand our charging network, even at locations where grid capacity is scarce.”

Geert De Mil,
Q8 Electric

The result: More room to expand fast-charging infrastructure

By combining battery storage and energy management, Q8 Electric can expand its fast-charging network to locations where grid capacity would otherwise stand in the way. Sites that were too small on grid capacity alone can now be considered for fast charging. The battery and the EMS work together at each site. Peak loads are absorbed by the battery, so the site stays within its contracted grid capacity, and the chargers stay available for drivers, even when several vehicles charge at the same time. This keeps the charging experience reliable and predictable, which is essential for a CPO.

The solution offers three key benefits:

More efficient use of grid capacity: peak loads are absorbed on site, so the existing grid connection is used better. Lower potential energy costs: electricity can be stored when it is cheap or widely available and used later at peak moments. Scalable charging infrastructure: new fast-charging locations can be developed with less dependence on extra grid capacity.

For 2026, Q8 Electric and Intercel are working together on battery storage at ten locations. This turns battery storage from a one-off solution into a standard part of how Q8 Electric builds its network. The partnership shows how battery storage can support the growth of electric mobility, even when the grid isn’t growing at the same pace.

We’re happy to help

More stories

  • City-Pomp E – Machined4You

    Machined4You’s City-Pomp E is an electric construction pump that uses an Intercel battery pack to absorb peak loads. This lets the pump run on a standard 230V…

  • 783 kWh – SPIE Breda

    SPIE uses a 783 kWh Intercel energy storage system at its Breda headquarters for peak shaving. Controlled by Phoenix Contact’s MINT EMS, the battery makes extra power…

  • Q8 – Benelux

    Q8 Electric combines Cellpower battery storage from Intercel with Flexecharge’s EMS to expand its fast-charging network across the Benelux. The batteries absorb charging peaks, so new locations…